Section 5 cockpit assembly top continued, ongoing.
Section 5 cockpit assembly top continued, ongoing.
Section 5 cockpit assembly top, ongoing
Prep work to get parts and materials for section 5 ready for assembly.
Section 4 main engine mounting and front cabin strut assembly. Parts inventory and layout. Assembly per instructions. Final nut tighten and torque deal application todo. Will update item when complete.
Section 3 cockpit lower support tube assembly, section 3.2 taildragger, figure 3.2 parts layout, assembly. Completed with the exception of the application of torque seal. eted with the exception of torque seal application. Will update this component when that’s complete.
Section 2 main fuselage section assembly, section 2.2 taildragger, figures 2.3 and 2.4 completed with the exception of torque seal application. Will update this component when that’s complete.
Section 2 main fuselage section assembly, section 2.2 taildragger, figures 2.3 and 2.4 parts layout, partial assembly. Ongoing.
Section 2 main fuselage section assembly, section 2.2 taildragger, figures 2.3 and 2.4 parts layout, partial assembly. Ongoing.
Section 1, Figure 1.2 bottom fuselage center bracket. Completed bottom fuselage center bracket with the exception of torque seal application. Will update this component when that’s complete.